Natalie Takacs serves as the Product Manager for the Connected Analytics reporting products at InEight. Her enthusiasm for data and analytics began in college. While working on a research project, she discovered how powerful capturing and drawing insights from data can be. She started at InEight in 2018 after supporting multiple company-wide reporting initiatives at Kiewit in the Technology Group. Helping users to eliminate multi-step, manual processes to save time and gain efficiency is one of reasons she loves the reporting and analytics space.
Posts By Natalie Takacs:
Construction, Sustainability and Connected Data
Why Having an Integrated Construction Platform is Becoming the New Normal
Getting it Together: Predictive Construction Data Platforms
Harnessing the Power of a Data-Driven Construction Culture
Taking a Bite Out of Cost Overruns with Data Analytics