ClickCease
Lorem ipsum

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Dominic Cozzetto

Dominic Cozzetto serves as a product manager at InEight, driving the development of InEight Plan and Progress products, which solve work planning, installation tracking, time entry and pre-payroll processing for contractors, owners and engineers. Prior to joining InEight, Dominic worked for TIC for 12 years in various leadership positions. These include roles as a field coordinator, field engineer, cost control engineer, project engineer and lead estimator on multiple small projects and mega projects, mainly in the power and industrial sector. Dominic also played a key leadership role in implementing a corporate-wide estimating solution, Hard Dollar, at TIC. He holds a BS degree in civil engineering from Colorado State University, Pueblo.