Construction Project Management Training Services

Regional Training

Hit the ground running with solution-specific training courses based on real-world tasks. All courses are hands-on and results-based, designed to shorten the learning curve and increase retention. Each course is facilitated by an experienced professional with a passion for learning.

InEight Estimate 101: Essentials of Project Modeling & Estimating

This two-day course includes a mixture of classroom-based presentations and discussions with hands-on practice exercises in the InEight Estimate tool, to ensure you meet the requirements of today’s estimators.

All exercises and concepts are included in a user’s manual that you will keep for reference after the class is over.

Participants learn

  • System Navigating and data customization
  • Data setup, including library data, resources and assemblies
  • Cost estimating basics
  • Basics of markup and bid pricing
  • Intro to quote management, BidWizard, and reproduction
  • Reporting

Who should attend
New InEight® software users who need to build a solid foundation or an existing user who needs a refresher or maximize their current knowledge with the product.

Schedule

  • March 3-4, 2020 | Anaheim, CA
  • April 7-8, 2020 | Denver, CO
  • May 5-6, 2020 | Las Vegas, NV
  • June 9-10, 2020 | Scottsdale, AZ

To Register

Call 480.776.2924 or email InEight at TrainMe@ineight.com

InEight Estimate 201: Advanced Project Modeling & Estimating

This two-day class takes a deep dive into InEight Estimate, covering additional tools you can leverage to help you save time and estimate more efficiently. The curriculum includes the latest enhanced features of InEight Estimate.

Participants learn

  • Data reproduction
  • Advanced data management
  • Excel import/export, linking to Excel
  • Cost Item assemblies
  • Cost allocation (spreading costs of one item across others in your estimate)
  • Account code utilization (setting up account code hierarchy to share estimate data with other systems)
  • Advanced quote management
  • Bid closing techniques
  • Benchmarking
  • Schedule integration (Primavera P6 or MS Project)
  • Tips and tricks (job snapshots and estimating shortcuts)

Schedule

Classes start at 8 AM local time.

  • March 5-6, 2020 | Anaheim, CA
  • April 9-10, 2020 | Denver, CO
  • May 7-8, 2020 | Las Vegas, NV
  • June 11-12, 2020 | Scottsdale, AZ

To Register

Call 480.776.2924 or email InEight at TrainMe@ineight.com

DOC P01: General User Training (Mail and Documents)

This three-hour course provides a basic introduction to the InEight Document system, covering the essentials of sending and managing mail in Document and accessing, downloading and transmitting controlled documents.

Participants Learn

  • Mail – Sending and receiving project communications, attachments, filtering/searching mail, mail status management, and simple reporting
  • Documents – Using the controlled document register, downloading documents, filtering/searching documents, viewing documents, simple uploading of documents, and sending Transmittals. Also contains a brief introduction to XL-Upload, InEight’s proprietary bulk upload utility for Document
  • Outlook Integration

Who Should Attend

All users of InEight Document. This is a mandatory course for all new users of InEight Document.

Schedule

  • Western Australia: March 03, 2020     | 09:30am – 12:30pm (AWST) | Webinar Registration
  • New South Wales: March 10, 2020     | 09:30am – 12:30pm (AEDT) | Webinar Registration
  • Queensland: March 17, 2020     | 10:30am – 01:30pm (AEDT) | Webinar Registration
  • Overseas: March 24, 2020     | 12:30pm – 03:30pm (AEDT) | Webinar Registration
  • Victoria: March 31, 2020     | 09:30am – 12:30pm (AEDT) | Webinar Registration
  • All Australian Projects: Apr 07, 2020     | 09:30am – 12:30pm (AEST) | Webinar Registration

Further Details

Please email docstraining@ineight.com

**All training outside VIC will be done as Webinars

DOC P02: Working with Controlled Documents

These one-hour modules provide a complete overview of working with controlled documents in InEight Document. It begins with a management level overview of Controlled Documents including methods of distribution and access and then covers the following:

WORKING WITH VARIOUS DISTRIBUTION METHODS FOR DOCUMENTS

This module covers the various methods through which users gain access to documents

PARTICIPANTS LEARN

  • Advance Transmittal management techniques
  • Packages
  • Administrative Document Access Control
  • Other Document access methods

BULK UPLOADING OF DOCUMENTS (INCLUDING XL-UPLOAD)

This module covers the bulk uploading of documents into InEight Document.

PARTICIPANTS LEARN

  • Document attributes
  • Validation of documents
  • Using XL-Upload and the Bulk Upload Wizard
  • Revising documents
  • Notifications to uploaders

WHO SHOULD ATTEND

Power Users – Document Controllers and Administrators who upload and administer document access in InEight Document

SCHEDULE

  • Western Australia: March 03, 2020     | 01:30pm – 04:30pm (AWST) | Webinar Registration
  • New South Wales: March 10, 2020     | 01:30pm – 04:30pm (AEDT) | Webinar Registration
  • Queensland: March 17, 2020     | 02:30pm – 05:30pm (AEDT) | Webinar Registration
  • Overseas: March 24, 2020     | 04:30pm – 07:30pm (AEDT) | Webinar Registration
  • Victoria: March 31, 2020     | 01:00pm – 04:00pm (AEDT) | Webinar Registration
  • All Australian Projects: Apr 07, 2020     | 01:30pm – 04:30pm (AEST) | Webinar Registration

Further Details

Please email docstraining@ineight.com

**All training outside VIC will be done as Webinars

Onsite Training

Bring an InEight instructor to your location for cost-effective group training.

Offerings include:

  • E101: Essentials of Project Modeling and Estimating
  • E201: Advanced Project Modeling and Estimating
  • E999: Expert coaching sessions, custom training to cover specific client needs

To Register

Call 480.776.2924 or email InEight at TrainMe@ineight.com

Instructor-Led Training

Virtual instructor-led construction project management training offered online for your convenience.

InEight Performance Job Tracking

New to InEight Performance, or looking to enhance your skills? Take advantage of this special virtual (web-based) training session and take your project controls to the next level. This two-hour course includes:

  • Live instruction from an experienced trainer
  • Interactive Q&A
  • Step by step simulation
  • Hands-on practice exercises

Participants learn

  • How to measure and analyze project progress in the job tracking register, including earned value, estimate to completion and CPI
  • How to use new forecasting features to help you better manage your costs
  • How to view planned versus earned versus as-built cost curves in InEight Performance
  • How to run InEight Performance reports

Who should attend

New InEight® software users who need to build a solid foundation or an existing user who needs a refresher to maximize their current knowledge with the tool.

To Register

Call us at 480.776.2924 or email us at TrainMe@ineight.com

DOC P04: Administration Training

This course provides participants with an understanding of typical InEight Document Administration functions. This course is a mandatory requirement for all Project Administrators.

Participants Learn

  • Project Maintenance
  • Project Details and Settings
  • Address Book
  • Security
  • Setting up users
  • Document Rules and Mail Workflow
  • Configuration Tables

Who Should Attend

Primary administrators and additional / backup administrators

Schedule

Further Details

Please email docstraining@ineight.com

DOC P05: Concise Document Training

This 30-minute course covers mail and document fundamentals sufficiently for 80% of users to get up and running with InEight Document straight away

Participants Learn

  • Understanding the Dashboard
  • Creating mail
  • Attaching documents
  • Using Outlook to send InEight Mail
  • Mail quick & advanced search tools
  • Using saved searches for outstanding RFI’s (Personal & Company)
  • Closing out Mail items
  • Understanding the Document Register
  • Documents quick & advanced search tools
  • Using saved searches in the Document Register

Who Should Attend

All users of InEight Document unable to complete the General User standard training course

Schedule (APAC) 

Further Details

Please email docstraining@ineight.com

DOC P06 - Concise Simulated Live Training

This 30-minute course covers mail and document fundamentals sufficiently for 80% of users to get up and running with InEight Document straight away. This course is a Simulated Instructor Led session

Participants Learn

  • Understanding the Dashboard
  • Creating mail
  • Attaching documents
  • Using Outlook to send InEight Mail
  • Mail quick & advanced search tools
  • Using saved searches for outstanding RFI’s (Personal & Company)
  • Closing out Mail items
  • Understanding the Document Register
  • Documents quick & advanced search tools
  • Using saved searches in the Document Register

Who Should Attend

All users of InEight Document unable to complete the General User standard training course

Schedule

Further Details

Please email docstraining@ineight.com

DOC P07 - Tender Package / Tender Portal Training

This 40-minute course covers our TenderPortal / Tender Packages module designed to simplify collaboration with your project’s bid packages. This course is a Simulated Instructor Led session

Participants Learn

  • Understand what a Tender Package is
  • How to create a tender package, assign submission criteria, add documents and issue package
  • Access and navigate the Tender Portal
  • Manage communication with Tenderers
  • Close packages and manage a virtual “tender lock box”

Who Should Attend

All users of InEight Document who need an understanding of how to navigate the Tender function within the application

Schedule

Further Details

Please email docstraining@ineight.com

DOC P08 - Review and Approval Workflow Setup

This 30 minute course covers the basics (and some advanced) concepts of managing your review team in your organisation. This course is a Simulated Instructor Led session

Participants Learn

  • The key drivers of the review process (Document Rules)
  • How to setup parallel and hybrid reviews
  • Key Project Settings that determine how your review workflow engine works

Who Should Attend

All users of InEight Document who are responsible for setting up and managing reviews on their Project

Schedule

Further Details

Please email docstraining@ineight.com

DOC P09 - Defect Module

This 30 minute course will focus on the fundamentals of the Defect Module. This course is a Simulated Instructor Led session

Participants Learn

  • Understand how Inspection Lists work
  • Register Defects on the Mobile and Web application
  • Generate Reports on Defects
  • Issue and manage Defect Notices to Sub Contractors

Who Should Attend

All users of InEight Document who need an understanding of how to setup and manage Defects on their projects

Schedule

Further Details

Please email docstraining@ineight.com

Custom Training Services

InEight offers development and delivery of custom training designed specifically for your  front office, back office, field office, and jobsite business needs.

Innovative Solutions to Shorten the Learning Curve and Ensure Quick “Ramp-up”

  • Customized training content with day-in-the-life scenarios to maximize applicability
  • Robust “performance support” materials and eLearning courses for repeatability and 24/7 availability

Offerings Include:

  • Training Planning – Definition of expected training results, resources involved, schedule, and scope
  • Training Development – Custom training tools designed for your specific business processes and workflows, using a blend of learning methods:
    • Instructor-led training
    • E-Learning
    • Video tutorials
  • Training Delivery – Instructor-Led training, taught by certified InEight trainers or Train-the-Trainer education to certify your own trainers

To Register

Call 480.776.2924 or email us at TrainMe@ineight.com

Cost Savings and Accelerators

  • Industry-specific content leveraged to fit your business requirements
  • Experienced instructors with a passion for training

To Register

Call us at 480.776.2924 or email us at TrainMe@ineight.com

A “Keen Eye” to Support Go-live and Beyond

  • Support for your business initiatives, including Best Business Practice alignment
  • Transfer of knowledge to ensure program sustainment and protect your learning investment

To Register

Call us at 480.776.2924 or email us at TrainMe@ineight.com