
Collaborative Document Management
Our document management system helps you streamline the capture, review, management and distribution of project documents. Because all your project documentation is stored in a centralized repository, you can reduce processing time by 30%.
InEight’s construction document control was designed for the construction industry, by construction professionals. With industry-leading features optimized for managing construction RFIs, construction punch lists, submittals and transmittals, you can be sure that teams are capturing the right information every time. InEight Document provides project-centric organizations with information visibility and better project team collaboration featuring intuitive web and mobile applications designed for the way field teams complete work.
- Document Control
- RFIs and Submittals
- Project Correspondence
- Job Photo Management
- Quicker Document Searches
- Project Data Capture
- Optimized Review and Approval Process
Ineight document
Ensure project teams have the right documents to make the right decisions at the right time.
InEight Resources
Browse our collection of webinars, case studies, blog articles and more for thought leadership and industry insights.
Training & Support for document management
Whether it’s product on-boarding, training or technical support, InEight offers a wealth of services to assist you:
- Document management system implementation by InEight’s team of industry experts
- A proven people-based organizational change management methodology
- Classroom training that can be onsite, remote or at InEight training centers
- Online certification, YouTube videos, training guides and manuals through InEight University