InEight to Showcase Purpose-Built Construction Tools at CONEXPO

Mar 3, 2020

SCOTTSDALE, Ariz. – In line with its commitment to produce better outcomes for all facets of construction and capital projects, InEight will feature Digital Construction Tools at the upcoming 2020 CONEXPO trade show. InEight’s Construction Tools are an intuitive portfolio of digital solutions aimed at helping industry professionals build their best work every time, at the upcoming 2020 CONEXPO trade show. These tools combine the construction project management fundamentals of estimating, scheduling, document control, time tracking and more into an assortment of easy-to-use, valued-based solutions.

“We have been hearing from the industry that there’s a real need to provide contractors with a foundation to begin their digital journey,” says AJ Waters, director of industry solutions at InEight. “Understanding that not all projects have the bandwidth for a massive overhaul, our Construction Tools are the answer for those ready to take their first step or next step to digital project management – wherever they choose to start.”

InEight’s knowledge-driven solutions provide everything needed to create an effective real-time connection between the office and the field, enabling industry professionals to get on their best path of construction.

InEight’s Construction Tools will be available for demonstration at CONEXPO, which takes place March 10-14, 2020 in Las Vegas.

About InEight
InEight delivers proven project certainty through advanced technology by helping owners, contractors and engineers visualize, estimate, control, connect and manage all aspects of their capital projects. Developed by construction professionals for construction professionals, InEight solutions deliver project confidence at every phase of the life cycle, helping minimize risk, control costs, increase efficiency and provide greater visibility for superior project outcomes. A subsidiary of Kiewit, InEight is based in Scottsdale, Arizona, U.S., and is ISO 27001-certified. For more information, visit InEight.com.

FOLLOW US:

REQUEST A DEMO:

More News Posts