Graham Sets a New Standard in Document Control with InEight

THE CHALLENGE

With nearly a century of experience, Graham Construction continues to grow across North America and embrace more challenging and complex projects. With operations spanning buildings, industrial, infrastructure, water, and development projects, Graham recognized an opportunity to standardize its document control processes across multiple systems, streamline operations, and decrease the risk of mismanaged data.

THE SOLUTION

To address its challenges, Graham Construction implemented InEight Document, to help standardize and streamline its document control processes. InEight Document enables Graham to maintain a consistent approach across all projects, ensuring that every team member has access to the latest, most accurate project information. The transition is facilitating a seamless integration with existing systems and allowing for a hybrid approach that accommodates both Graham’s internal needs and the requirements of project owners.

THE OUTCOME

InEight Document revolutionized Graham’s approach to document control. The standardized processes led to significant improvements in efficiency and reliability across tasks and teams. Projects, regardless of their size, benefit from consistent and streamlined operations. The enhanced document control system not only reduced the risks associated with external data storage but also prepared staff for seamless transitions between projects of varying scales.


Are you ready to build project certainty with real-world data?


ABOUT INEIGHT

InEight is a leader in construction project controls software, empowering over 850 companies taking on challenging projects in industries including construction and engineering; transportation infrastructure; mining; water; power and renewables; and oil, gas and chemical. Uniquely suited to capital construction and other complex work, our integrated, modular software manages projects worth over $1 trillion globally, taking control of project information management, costs, schedules, contracts, and construction operations, and delivering insights with advanced analytics and AI. InEight’s solutions adapt and scale to meet the dynamic needs of modern construction, driving operational excellence and successful project outcomes.

FOLLOW US:

REQUEST A DEMO:

Related Resources