HNTB Delivers Proposals with Confidence with InEight Estimate

Discover how HNTB leverages InEight’s bottom-up estimating capabilities to move beyond long-standing practices. With InEight Estimate, the HNTB team can deliver comprehensive proposals and ensure every dollar is accounted for, providing clients with unmatched detail and confidence in their deliverables.

FOLLOW US:

FEATURED:

Related Resources

Estimate with Clarity

Estimate with Clarity

Hear from InEight customers as they share how they’re using InEight Estimate to get detailed cost tracking that connects bidding through execution and back to benchmarking. Learn how these customers use InEight to create a continuous data loop that ensures accountability, improves communication across all team levels, and build a historical cost database for future projects.

InEight Estimate: When Detail Makes the Difference

InEight Estimate: When Detail Makes the Difference

Hear from Scott Brower, Project Manager at HNTB, as he recounts how he used InEight Estimate to create a thorough, detailed project estimate—mapping every component of a complex tunneling job “down to the nuts and bolts”. As a result, his bid was so comprehensive that the Engineer of Record adopted his estimate over conventional methods.

Pattern Energy Streamlines Project Controls with InEight

Pattern Energy Streamlines Project Controls with InEight

Following rapid growth, Pattern Energy transformed its project control operations with InEight. Hear from Pattern Energy’s Director of Project Controls, Izabela Okon-Uribe, as she shares how her team uses InEight to optimize operations, boost collaboration, and gain deeper insights into budgets, risks, and forecasting.