InEight Model

Visualize and Manage Your Project Data

InEight Model provides a dynamic, federated environment that integrates 3D models with real-time project data, allowing stakeholders to easily access up-to-date information. This tool simplifies progress tracking, clash detection, and team coordination, ensuring clarity and control throughout the entire project.

InEight Schedule

Unify Data

Federated Model Integration

Standardize and integrate disparate models and project data into one common data environment.

Streamline Accuracy

3D Design Coordination

Visually review potential design clashes in 3D and streamline coordination across teams.

Enhance Clarity

Contextual Model Views

Easily save and share rich model views with project teams for improved context and communication.

Optimize Lifecycle Management

Digital Twin Creation

Maintain a complete history of project data by creating an enriched digital twin that can extend into maintenance and operations.

InEight Model- Key Features

Z
Unified Model Environment
Connect every stakeholder in a single environment, regardless of the number and types of models.
Z
Powerful Visualizations
Highlight the model to display progress, status or upcoming areas of focus.
Z
Link data with your model elements
Use the model to navigate your project data and make it easy for stakeholders to quickly find what they need.
Z
Manage Cross-Team Coordination
Manage coordination, find and track clashes and visualize issue hot spots in a federated model environment.

Frequently Asked Questions

What are the benefits of a digital twin?
A digital twin provides two primary benefits — the most common is its ability to help the owner optimize the operation of a facility, asset, or system, while the less commonly realized benefit is the advantage a digital twin provides a contractor during turnover. A digital twin provides an easy-to-follow recipe for a pristine project deliverable and allows both contractors and owners to gain insights from a snapshot of the project or facility.
What are the advantages of 3D quantity takeoff?
Traditional quantity takeoff requires going through multiple drawings to collect dimensional data, and then typing that data into a software program to calculate desired quantities. With a 3D model, the dimensional data is used directly in calculations and summations for the desired quantities. With support of model analysis and data transformation tools, quantities can be calculated quickly and synced to estimating tools.
What is 3D model aggregation?
To get a comprehensive visual of a facility, project, or scope of work, you’ll need the ability to combine 3D model data regardless of where it came from. Model aggregation often combines the 3D models from design, construction and various trade partners into a single environment, allowing coordination issues to be identified and resolved, and providing stakeholders with access to the overall project.
What is Building Information Modeling (BIM)?
Building Information Modeling is, at its core, the connection between 3D models and relevant detail information. Often, BIM is the practice of creating a data rich 3D federated model that provides a collaborative environment for cross-functional teams. Architects, engineers, contractors and owners can streamline work processes using a single BIM environment.
What is clash detection?
Clash detection is a crucial part of a BIM process, speeding up project activities by allowing teams to coordinate from digital design files before hitting obstacles. When project groups bring together 3D models into a single common environment, the use of clash detection tools help the teams check for hard and soft clashes for resolution prior to wasting time and materials.

Related Resources

For Profitable Construction, Rethink Scheduling

For Profitable Construction, Rethink Scheduling

On average, 12% of a capital construction project’s total valuation goes to rework. Avoiding Rework in Capital Construction For decades, scheduling practices have been held back by available tools and—let’s face it—traditional thinking. Increasingly complex projects...

3 Scheduling Myths Limiting Capital Construction

3 Scheduling Myths Limiting Capital Construction

Don't let scheduling myths define your reality. 3 Scheduling Myths Limiting Capital Construction explores the misguided mindsets that have plagued the scheduling process for decades. Explore how breaking these myths can help: Generate stakeholder buy-in Promote...

3 Tips: Driving Value With Document Control

3 Tips: Driving Value With Document Control

Document control takes many shapes and forms. In InEight’s years of providing purpose-build capital construction solutions, organizations constantly find new and exciting ways to shape our tools to better fit their needs. 3 Tips: Driving Value With Document Control...

Ready To
Get Started?

Book a demo to see why InEight is the construction project controls software your business needs to deliver project certainty.