InEight Resources

Resource Center

Browse our collection of customer stories, guides, articles, and projects.

CUSTOMER STORIES VIEW ALL ›

Burns & McDonnell Brings Greater Visibility to Power Project Estimating

Cole Bundy, Power Estimating Department Manager for Burns & McDonnell, shares how consolidating estimating data in InEight has helped create greater visibility across projects.

InEight Estimate: When Detail Makes the Difference

Hear from Scott Brower, Project Controls Manager, as he recounts how he used InEight Estimate to create a thorough, detailed project estimate—mapping every component of a complex tunneling job “down to the nuts and bolts”. As a result, his bid was so comprehensive that the Engineer of Record adopted his estimate over conventional methods.

Pattern Energy Streamlines Project Controls with InEight

Following rapid growth, Pattern Energy transformed its project control operations with InEight. Hear from Pattern Energy’s Director of Project Controls, Izabela Okon-Uribe, as she shares how her team uses InEight to optimize operations, boost collaboration, and gain deeper insights into budgets, risks, and forecasting.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

6 Practical Steps to Aligning Strategy and Technology in Capital Work

Most capital construction organizations adopt technology reactively — and fall further behind. Get a six-step roadmap for aligning digital strategy to business outcomes so your organization can compete and win.

3 Document Control Practices for Complex Projects

In the fast-paced and complex world of capital construction, staying on schedule and within budget is more challenging than ever. With our comprehensive e-book, 3 Document Control Practices for Complex Projects, you gain access to expert insights and strategies that...

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Improving Cash Flow Predictability on Cost-Reimbursable Construction Projects

See how connected billing workflows reduce revenue lag, shorten reconciliation cycles, and improve cash flow forecasting on projects.

Integrated Project Controls Improve Construction Risk Management

Reduce construction risk with integrated project controls and early alignment. Connect cost, schedule, and risk data for better visibility.

Using Advanced Work Packaging to Predict and Prevent Schedule Slippage

Advanced Work Packaging prevents schedule slippage in capital projects with early risk detection, real-time tracking, and predictive control.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

PROJECT GALLERY VIEW ALL ›

Pattern Energy Group: SunZia Wind and Transmission

SunZia Wind and Transmission is a landmark renewable energy project that combines 3,515 MW of wind generation and a 551-mile HVDC transmission system to deliver clean energy across the Southwest, setting a new benchmark for large-scale renewable power in North America.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.