Connecting Short-Interval Planning to the Master Schedule
Eliminate side schedules and keep teams aligned with our integrated look-ahead planning tools. InEight Schedule synchronizes every level of project scheduling so contributors can identify mismatches and integrate updates with the master schedule.
Keep every level of planning within the context of the master schedule. In most look ahead or short interval planning meetings, teams can lose sight of major milestones in the CPM schedule. With InEight Schedule, teams work in a digital environment that maintains a constant line of sight to the master schedule, helping them understand how field plans impact the overall project.
InEight Schedule features:
- Scheduler-controlled syncing: Ensure updates to the CPM schedule are reviewed and approved before being applied
- Intuitive digital whiteboard planning: Plan work using familiar whiteboard-style tools with digital sticky notes to build and adjust activities
- Breach identification alerts: Highlight mismatches between field plans and the CPM schedule so teams can see impacts in real time
- Shared responsibility visibility: Allow team members to view responsibilities across activities and better coordinate work
- Integrated updates to the master schedule: Sync field planning changes back to the CPM schedule to maintain alignment throughout execution
Integrated look-ahead scheduling helps teams keep field planning connected to the master schedule, improving coordination and maintaining alignment across all levels of planning.