How to Choose the Right Document Control System

Originally Aired on 11/12/2020 | 52 Min Watch Time
Every business needs a way to manage their records and documentation. Without one, you lose efficiencies and increase risk. But for capital construction projects, the stakes are even higher. With multibillion-dollar projects underway for years, if not decades, your document management system is what creates the continuity, visibility and streamlined collaboration you need.

In this interactive webinar, you will learn:

  • The eight must-have features every construction document control system should include.
  • How leveraging the right system saves time, cuts costs and improves collaboration.
  • The best practices for document management in the construction industry.

We’ll outline the key requirements of an effective document control system and why yours should be built with construction in mind.

Your organization has already seen the benefits of InEight’s estimating solution. Now, we’d like to demonstrate how the right document management software can maximize your productivity and minimize risk.

FOLLOW US:

FEATURED:

Related Resources

Lessons in Innovation from Kiewit’s Work on South Fork Wind

Lessons in Innovation from Kiewit’s Work on South Fork Wind

As one of North America’s leading capital contractors, Kiewit delivers everything from manufacturing and fabrication to offshore and power delivery efforts. In 2024, that dedication manifested in the successful delivery of the first-of-its-kind South Fork Wind farm just off the coast of Rhode Island and New York state.

Sundt’s Blueprint to Building the Most Skilled Workforce in America

Sundt’s Blueprint to Building the Most Skilled Workforce in America

Since its founding in 1890, Sundt Construction has led the North American construction industry. Today, the full-service contractor continues to maintain its place at the forefront of innovation as it leads the most skilled workforce in America.

Through initiatives emphasizing career awareness, comprehensive training, and inclusive environments, Sundt Construction continues to integrate people, processes, and technology to ensure quality performance and foster a culture of excellence and innovation.