Future of Mining Australia 2025

Location: Perth, Australia

Date: 1-2 July, 2025

Venue: The Crown Perth

Panel Sessions: “Optimizing Data Through Integration and Interoperability” and “GenAI Applications”

Speakers: Umer Lone, Senior Solution Engineer, InEight

Meet InEight at Future of Mining Australia 2025 1-2 July 2025 in Perth, where you’ll learn strategies to help your operation keep up with the uncertainties and many challenges facing today’s mining industry—and shape a resilient future.

Stop by our stand, where our expert team will be happy to answer your construction project controls questions and show you how InEight’s innovative solutions are helping global mining operations reduce subsurface uncertainty, improve decision-making, and operate with confidence.

On Thursday 1 July, don’t miss the two expert panel sessions featuring InEight Senior Solution Engineer, Umer Lone.

Gain insight into how your operation can enhance productivity, reduce downtime, and drive smarter decision-making by effectively integrating diverse data from legacy and new digital systems. Then, explore the transformative potential of GenAI across the mining value chain. Through real-world case studies, you’ll get a roadmap for improving productivity, optimizing decision-making, and reducing costs.

We hope to see you there!

FOLLOW US:

FEATURED:

More Events

BuiltWorlds Construction Tech Conference

BuiltWorlds Construction Tech Conference

Location: Chicago, IL | Date: July 8-9, 2025 | Venue: Willis Tower |
Join InEight at the BuiltWorlds Construction Tech Conference in Chicago and hear how industry leaders are driving the adoption of cutting-edge technology in construction.

AACE International Conference & Expo 2025

AACE International Conference & Expo 2025

Location: Anaheim, CA | Date: June 15-17, 2025 | Venue: Anaheim Marriott |
Learn how your estimates and schedules can align with InEight at the AACE International Conference & Expo 2025 in Anaheim, CA.