Top 3 reasons to adopt advanced work packaging
1. Reduce Schedule and Cost
Coordinating and sequencing work across the project life cycle through the adoption of Advanced Work Packaging (AWP) can reduce Total Installed Cost by 10%*.
2. Increase Productivity
Ensuring that people have the equipment, materials and instructions to complete their work, to reduce idle time and increase labor productivity by as much as 25%*.
3. Improve Predictability
Establishing stakeholder collaboration at the outset of the project permits the design of a constraint-free work environment in the field, resulting in more predictable outcomes.
Why is ineight the best choice for
advanced work packagaing?
KNOWLEDGE-DRIVEN FORECASTING
Advanced Work Packaging is heavily reliant upon having a sound cost and schedule forecast as early as possible. InEight’s planning, scheduling and risk solution enables organizations to build a top-down, risk-adjusted forecast in the initial phases of a project and then build out detail from this throughout the project life cycle, even into field execution.
TRULY INTEGRATED PLANNING AND FIELD EXECUTION SOLUTION
Advanced Work Packaging drives optimization by aligning planning and field execution. InEight’s short interval planning (SIP), daily field planning and mobile progressing tools provide a mechanism for this seamless bidirectional flow of project data.
DIGITAL THREAD ENABLEMENT
Advanced Work Packaging results in multiple types of project data being connected. InEight’s integrated cloud platform is designed to enrich data and knowledge to support establishing the digital thread.
VISUALIZATION
Advanced Work Packaging helps pinpoint engineering and procurement dependencies through Paths of Construction. InEight’s modeling and visualization solution enables an organization to interactively pinpoint such dependencies and paths.
DELIVERABLE-BASED PLANNING
Advanced Work Packaging aligns execution workfaces with components and deliverables. InEight’s daily field planning solution provides an industry-unique level of detail at which this can be accomplished.
COLLABORATION AND COORDINATION
Advanced Work Packaging drives project collaboration across disciplines and stakeholders. InEight’s solution captures expert opinion from multiple sources (even crossing owner/contractor boundaries), combining them into a consensus-driven forecast.