REQUEST A DEMO
Learn how InEight’s modular, integrated construction software can help capital project teams manage scope, cost, and schedules with greater visibility for better outcomes.
Trusted By Industry Leaders
InEight Demo – Frequently Asked questions
How long is the InEight demo, who should attend, and how can we prepare?
An initial InEight demo typically lasts 30 to 60 minutes. The most effective sessions include multiple participants so that we can answer everyone’s questions.
To prepare for the demo, it helps to be ready to discuss:
- Your project types, such as EPC, nuclear, or infrastructure
- The systems you use today, including ERP, scheduling, and document tools
- Your main challenges, such as forecasting, change management, reporting, and project closeout
How is InEight priced?
InEight offers enterprise pricing and per-user pricing. Enterprise pricing is based on the modules implemented, the number of users, and the contract term. Your sales team will build a full picture of your operating model, technical environment, and growth plans before proposing a solution along with custom pricing. Some teams choose per-user pricing to support a focused deployment before an enterprise roll out.
How do I ensure InEight will integrate with our existing systems?
InEight integrates with enterprise systems such as SAP, Oracle, Dynamics 365, and other financial and project management tools. This is enabled by InEight’s connected data model, which links cost, schedule, contracts, change, progress, and documents across the platform.
During the demo, InEight will review your current systems and demonstrate how cross-module data flow and the external integration library support data movement for your organization.
How does InEight handle security, data protection, and compliance?
InEight provides enterprise-grade security through role-based access control, encryption, audit logging, vulnerability management, and independent testing. InEight is hosted on Microsoft Azure with TLS-encrypted data transfers and customer-controlled authentication through Azure Active Directory.
InEight Security Certifications include:
- ISO 27001
- ISO 27701
- ISO 9001
- SOC 1 Type 2
- SOC 2 Type 2
InEight Document is FedRAMP® Certified at Class C (Moderate), supporting government, defense, and highly regulated capital programs.
Does InEight support EPC, design-build, and joint venture delivery models?
To support complex capital projects, InEight is designed to work across multiple delivery models, including EPC, EPCM, design-build, owner-led, and joint-venture structures.
The demo shows how workflows and data structures align to how you deliver projects.
What happens after the InEight demo?
After the demo, InEight provides a summary of what was covered and recommends next steps. These may include deeper workflow sessions, integration discussions, or pricing options.
InEight software gives us the opportunity to understand our commitments and understand where we can be looking forward or if we need more funding. It’s a source of real-time project control data that we can give stakeholders to provide better outcomes across the business.
– Mark Simister, Head of Program Delivery, Sydney Water
Our project stakeholders need a single source of truth for all project engineering documents & data. They need the latest information for the right time & purpose. If we deliver such a project without any form of accountability, it would exponentially increase our costs. We cannot afford anything less than immediate access to data with full transparency & accountability. That’s what we get with InEight.
– Joseph Lopez, Information and Records Manager, Transurban
We’re not a software company, we’re a construction company, so someone like InEight is perfect for us.
– Allan Fett, Product Controls Engineer, Decmil
As LAX grows, so does the complexity of capital projects & operational maintenance. Our in-field crews leverage the InEight platform for mission-critical processes like QA, issue tracking, commissioning, closeout, & transfer of information to post-construction operations. InEight software works with huge amounts of data at greater levels of detail in appropriate context for improving the project delivery process.
– Frank Peters, cBIM Program Manager, Los Angeles World Airports
InEight’s construction background enables them to understand our needs and offer us a construction solution rather than just a software solution.
– Tom Baskind, Technology Manager, Graycor