Future of Mining Australia 2026

Location: Perth, Australia

Date: 16-17 June, 2026

Venue: Crown Towers Perth

Session Titles:

Breaking Down Silos: Data Integration and Interoperability

16 June, 14:45–15:15

Leveraging AI and Data Analytics to Optimize Mining Performance

17 June, 13:35–14:15

The mining industry is facing significant challenges: geopolitical tensions, shifting trade policies, and emerging tariffs are creating uncertainty, while net-zero demands are increasing, the skills gap is widening, and safety concerns remain.

Future of Mining Australia 2026 unites innovation, technology, and the mining community, providing an ideal forum to explore practical solutions that empower mining organisations to move beyond the status quo and shape a resilient future.

InEight is leading two panel discussions that reflect this year’s event theme: Mining Smarter. Mining Better. Come discover how leading global mining organisations are breaking down data silos and using AI and data analytics to improve decision making, increase efficiency, mitigate risks, and optimize mining performance.

Image of Umer Lone

Umer Lone

Senior Solution Engineer, InEight

FOLLOW US:

FEATURED:

More Events

Future of Construction Summit

Future of Construction Summit

Location: Brisbane | Date: 19-20 May, 2026 | Visit InEight at The Future of Construction Summit (FCON26) to discover how integrated project controls are helping Australian capital construction organisations meet growing demand and deliver with confidence.

AACE Conference & Expo 2026

AACE Conference & Expo 2026

Location: Las Vegas, NV | Date: June 28-30, 2026 | Venue: MGM Grand | The AACE Conference & Expo convenes the leading cost and project controls experts and dedicated professionals in the world. Presentations undergo a rigorous peer review process to ensure attendees receive the highest quality education.

Digital Construction Week

Digital Construction Week

Location: London, England | Date: June 3-4, 2026 | Venue: Excel London | Learn about the latest trends in digital construction, from BIM and AI to robotics and sustainable solutions. Meet companies driving architecture and design, construction, engineering and operation forward.