Among the many goals of every construction estimate, accuracy must be considered the most important. Why? Because estimates that lack accuracy can adversely affect a capital project and possibly even jeopardize a construction company’s reputation and solvency. Yet calculation mistakes remain relatively common, items are sometimes inadvertently excluded, or initial data may prove to be incorrect or too old to be relevant.
But as the industry has matured and technology has gradually become more embedded in the estimating process, things are improving. Construction estimating software in particular is making what has been quite a convoluted process much more streamlined and precise. Along with these improvements, there are several best practices that, when used in tandem with this software, can create an even more optimized process to better manage the many details that become part of the final estimate.
Ensure true understanding of scope and requirements
Each client has their own vision of what their project will be. Effectively conveying that to the contractor is essential to create an accurate estimate based on their requirements. Conveying it is one thing; understanding it is another. Otherwise there’s the real risk of operating on assumptions and misperceptions that can lead to an estimate that is either too ambitious or doesn’t align with client requirements, even if using construction estimating software.
Gaining this true understanding hinges on opening the lines of communication between the client and contractor. Dialogue at this early stage of the estimating process accomplishes several objectives. It facilitates a productive discussion about the client’s vision, determining what they need and what they expect to get out of the project. It helps more easily verify requirements and clarify misunderstandings. And it creates transparency and trust in the estimating process as well as the contractor-client relationship.
The details that emerge from this collaboration form the basis of the scope of work, outlining all the deliverables, timelines, and tasks necessary to accomplish the objectives of the project. It’s these details that construction estimating software relies on to produce an estimate that is realistic, accurate and meets client requirements.
Make past projects do some of the heavy lifting
After becoming familiar with the vision and requirements of a project, it’s easier to reach back to the most comparable past projects from which to import data that will further inform the estimate and establish a baseline. Naturally, there will be differences between those previous projects and the current one. Those earlier discussions with the client will help determine the project-specific differences in scope and constraints to adjust for in the estimate, including design, materials, labor rates, etc.
Those aren’t the only kinds of data that will have value as the new estimate comes together. While reviewing historical project data, conduct a risk analysis not of just the type and degree of risks but their measured impact as evidenced through earned value management (EVM) metrics. The trends and trajectories of these performance indicators give clues to the ways in which real-world risks affected costs and schedules, and whether contingency plans played a mitigating role. If there’s a possibility they could surface in this project, use them as what-if scenarios against which to run forecasts of their impact on cost (CPI) and schedule performance indicators (SPI). And from there, develop contingency plans that can be put into place when CPI and SPI values react to the onset of those risks.
Turning to real-world historical data and retrospective risk evaluation has the added benefit of countering any unintended or ambitious tendency toward optimism bias, a common factor in project outcomes widely missing the mark against original estimates.
Enjoying this blog?
Join the InEight Blog Newsletter for the latest industry news!
InEight’s blogs are some of the best sources of news and trends coming out of the construction industry. Join our newsletter today to stay up to date on the latest industry news!
Establish a standardized construction estimating process
The fact that there are so many ways to approach the process, and so many different types of estimators and methods of estimation, may make it seem like there’s no consistent way to do things. But, there are some basic steps construction estimators go through that can be standardized to make the process more manageable, efficient and effective.
Beyond the process itself, there’s also the opportunity to standardize the actual estimates. And why not when there’s commonality in the kinds of information estimators gather? It can certainly make estimators’ jobs that much easier. Construction estimating software helps support both with essential built-in formulas and fields that consistently capture the details estimators need to ensure completeness. And one of the ways this software streamlines estimates is in its ability to manage the endless cost assemblies for frequently built components, a huge advantage when working on complex capital projects. All of this combined helps markedly reduce the number of changes stemming from miscalculations, data entry errors or overlooked line items that can happen during the estimation phase and can also limit the number of change orders during construction.
There’s certainly value in implementing something that’s repeatable. It introduces a degree of predictability and confidence in an otherwise involved and layered process that has historically been susceptible to unintended missteps.
While there are different types of tools available for developing estimates, the scale and complexity of today’s capital projects are compelling construction companies to turn to robust construction estimating software. A solution like InEight construction estimating supports all aspects of the estimating process. Created by construction professionals for construction professionals who work on capital projects, it helps you not only achieve higher levels of accuracy with far fewer mistakes, it streamlines the complex estimating and cost management process. Request a demo to see it in action.
Sign up for our monthly blog newsletter today and stay up to date on the latest industry news.