Annual
Monthly
ESTIMATE NOW
$199
Per seat/month (billed annually)
Import bid forms, sub/vendor quote comparison, and out of the box templates to build accurate estimates fast. No IT or complex contracts required. Flexible seat count.
SCHEDULE NOW
$150
Per seat/month (billed annually)
Includes access to schedule creation, mark-up, CPM, and short interval planning. No install or IT required. Seat count is flexible.
DOCUMENT NOW
$52
Per seat/month (billed annually)
Seamlessly manage your project's specs, drawings, and requirements with real-time access and version control. No IT setup required. Flexible seat count.
ESTIMATE NOW
$260
Per seat/month (billed monthly)
Import bid forms, sub/vendor quote comparison, and out of the box templates to build accurate estimates fast. No IT or complex contracts required. Flexible seat count.
SCHEDULE NOW
$199
Per seat/month (billed monthly)
Includes access to schedule creation, mark-up, CPM, and short interval planning. No install or IT required. Seat count is flexible.
DOCUMENT NOW
$73
Per seat/month (billed monthly)
Seamlessly manage your project's specs, drawings, and requirements with real-time access and version control. No IT setup required. Flexible seat count.
Pricing shown in USD*
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2025 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
