Design Management
InEight Design Management brings a new level of certainty to design-build and alternative delivery projects.
BENEFITS
- Get better control of design scope, design deliverables and design quantities — from pre-planning through turnover
- Easily collaborate with anyone on the project team with a cloud-based solution
- Gain the visibility you need to manage quantity growth risks as well as update the overall project budget and schedule
- Minimize questions and billing disputes because you’re using a consistent framework to track and report on design progress and earnings
REDUCTION
in engineering costs.
REDUCTION
in time spent managing design documentation and drawing review workflows.
REDUCTION
in risk associated with design quantity growth.
THE PILLARS OF ON-TIME PROJECT DELIVERY
InEight enables you to progress your work, manage your budgets and report on earned values to keep your projects on track.
Stay in control of engineering project scope, deliverables and design quantity forecasts.
Manage engineering project budgets, earned values and document workflows.
Get full visibility across design and construction with a comprehensive project controls solution for design-build projects — before the build starts.
FEATURES
- Access and maintain all design documentation in one common repository
- Use earned value management (EVM) to bring more detail and credibility to the design and engineering phase
- Assign design resources to design scope to ensure resource capacity is aligned to project requirements and dates
- Track design work progress of each deliverable through 30-60-90-IFC milestones
- Use rules of credit or claiming steps to automatically calculate percent complete as each step is accomplished
RELATED SOLUTIONS
Solve more of your biggest project pain points by exploring additional solutions.
COST BUDGETING & FORECASTING
Empowers project stakeholders to create accurate forecasts and budgets based on real-time metrics.
WORK PLANNING & PACKAGING
Our fully connected work packages are built to improve field execution and deliver more successful project outcomes.
Ready To Get Started?
Schedule a one-on-one consultation with an experienced InEight solutions expert.