BUILDING INFORMATION MODELING/DIGITAL TWIN

InEight Building Information Modeling/Digital Twin delivers a common repository of design data for the entire project, so everyone knows where to get the latest design information.

BENEFITS

  • Drive project team efficiency with a data-federated view across all the models that make up the project
  • Go beyond design coordination by connecting models and design data to project controls workflows — without all the manual effort
  • Turn tedious multistep routines into repeatable, automated procedures that run with a single click
  • Replace the mountain of paperwork and disconnected files that go to the owner/operator with a structured, searchable digital record that can be accessed by simply interacting with the model
200%

INCREASE

in design coordination efficiency across stakeholders.

75%

REDUCTION

in time spent importing and exporting data between design and other enterprise systems.

50%

REDUCTION

in time spent searching for data to support construction and maintenance activity.

THE PILLARS OF BETTER DESIGN DATA ACCESS

InEight provides one common repository of design data so everyone on the team knows where to get the latest design information.

BUILD

Aggregate, clean up and tag design data across multiple disciplines within a common BIM environment.

CONNECT

Improve collaboration across the entire project team by connecting model data to workflows such as estimating, design review, work planning, quality and commissioning.

INNOVATE

Create digital twins to support ongoing asset maintenance by connecting as-built models with project documentation, photos and inspection forms.

BIM/Digital Twin allows project teams to easily leverage accurate model data from a single source of truth to perform critical project controls functions.

FEATURES

  • Bring together as-designed and as-built information via a digital twin and connect it with project documentation
  • Get an aggregated view across all disciplines, ensuring teams are always working from the latest design data
  • Easily turn on or off specific models in the aggregated set and run global filters to look at components with specific properties across all the models
  • Leverage world-class functionality in design coordination with clash detection and collaborative design reviews — and easily identify design changes and conflicts

RELATED SOLUTIONS

Solve more of your biggest project pain points by exploring additional solutions.

QUALITY MANAGEMENT, STARTUP & COMMISSIONING

Helps you meet quality and commissioning requirements to deliver an efficient project turnover.

View More

DOCUMENT CONTROL & TURNOVER

Provides everyone with the latest, most complete data so everyone can make the most informed decisions on a project.

View More

Ready To Get Started?

Schedule a one-on-one consultation with an experienced InEight solutions expert.