Capital & Contract Management

Take control of your projects and improve construction budgeting and estimating by combining benchmarking, budget management and project forecasting. With our capital and contract management solutions, you can facilitate contract and change management throughout the project, resulting in a 20% reduction in contract and change turnaround time.

Learn More >

Connected Analytics

Make real-time decisions as you gain visibility into metrics, KPIs and trends, driving continuity in operations.

Learn More >

Document Management

Our document management solution helps you streamline the capture, review, management and distribution of project documents. Because all your project documentation is stored in a centralized repository, you can reduce processing time by 30%.

Learn More >

Estimating & Project Cost Management

Our project cost management solutions help you create more accurate and timely project estimates, increase your forecasting accuracy, and improve the anticipated project ROI.

Learn More >

Field Execution Management

Manage work packages and daily crew plans to deliver and capture predictable results in the field, reducing project costs 10%.

Learn More >

Integrated Project Controls Platform

Only InEight provides a complete portfolio of capital project management software that supports enterprise-wide digital transformation.

Learn More >

Planning, Scheduling & Risk

Create, collaborate and risk-adjust plans to achieve more than 75% confidence in project execution.

Learn More >

Safety, Quality & Commissioning

Capture and analyze safety, compliance and quality data directly from the field, reducing rework by 10%.

Learn More >

Virtual Design & Construction

Use an aggregated 3D model as a common data environment, increasing clash resolution efficiency by more than 200%

Learn More >

Document

Successful companies recognize that only by streamlining the process of capturing, controlling, accessing and tracking project documentation can they create the controlled, secure and accessible environment necessary to run on-time, profitable projects. Increase the impact of your Document management process with cross-product integrations with InEight Model and Contract, keeping important project information warehoused in one secure location.

BUILT BY: InEight

TYPE: API

METHOD: Dynamic

IMPLEMENTATION COMPLEXITY: Low

Compatible with:

InEight Report
REQUEST INFO