InEight Resources

Customer Stories

Why Integrated Systems Matter for Megaproject Success

Paul Griffiths, Senior Vice President at AECOM, explains why major capital programs need integrated systems like InEight. As clients face greater complexity, having connected, purpose-built solutions is essential for effective delivery.

Graham Construction Advances Enterprise Reporting with InEight

Graham Construction needed a modern replacement for its legacy project management system. In this video, David Gray, Director of Project Controls at Graham Construction, explains why the company chose InEight’s integrated platform.

Scaling Construction Operations with Smarter Data and Connected Tools

Philip Bloomfield, VP of Construction at Graham Construction, shares how the company approaches training and onboarding to support a consistent, high-performing team while meeting rising owner expectations for faster, more detailed insights.

InEight Estimate: When Detail Makes the Difference
Winning more bids withInEight Estimate

InEight Estimate: When Detail Makes the Difference

Hear from Scott Brower, Project Controls Manager, as he recounts how he used InEight Estimate to create a thorough, detailed project estimate—mapping every component of a complex tunneling job “down to the nuts and bolts”. As a result, his bid was so comprehensive that the Engineer of Record adopted his estimate over conventional methods.

Pattern Energy Streamlines Project Controls with InEight

Pattern Energy Streamlines Project Controls with InEight

Following rapid growth, Pattern Energy transformed its project control operations with InEight. Hear from Pattern Energy’s Director of Project Controls, Izabela Okon-Uribe, as she shares how her team uses InEight to optimize operations, boost collaboration, and gain deeper insights into budgets, risks, and forecasting.

TRENDING

InEight Estimate: When Detail Makes the Difference

Hear from Scott Brower, Project Controls Manager, as he recounts how he used InEight Estimate to create a thorough, detailed project estimate—mapping every component of a complex tunneling job “down to the nuts and bolts”. As a result, his bid was so comprehensive that the Engineer of Record adopted his estimate over conventional methods.

Pattern Energy Streamlines Project Controls with InEight

Following rapid growth, Pattern Energy transformed its project control operations with InEight. Hear from Pattern Energy’s Director of Project Controls, Izabela Okon-Uribe, as she shares how her team uses InEight to optimize operations, boost collaboration, and gain deeper insights into budgets, risks, and forecasting.